News
  • Facebook
  • LINE
  • Twitter
  • LinkedIn

Tai power hydro plant by EZ4U

2012/4/2
One of Tai power Hrdro plant cut and cover culvert using EZ4U system and labor to make this 200 meters tunner , the roof is inclned, using truss single face wall and heavy duty shoring system for roof.forklifter will be good choice for moving all system horzontally.

Previous Page